Impact analysis of a new metro line in Amsterdam using automated data sources
A new metro line (the north-south line) was opened in Amsterdam in July 2018, adding significant capacity to the existing urban public transport network consisting of bus, tram and metro modes. The opening of the metro line was accompanied by changes to the existing bus and tram network, such as removal of duplicate routes and addition of feeder routes.
Traditionally, the impact of such a network change was measured either ex-ante or post-op based on surveys or model forecasts (Vuk 2005; Knowles 1996; Engebretsen, Christiansen, and Strand 2017). However, with the availability of automated data sources such as the smart card data, the exact impact on transit demand and service quality can now be measured. However, so far this has been limited to analysing the changes in travel times and reliability at a trip level (Fu and Gu 2018), excluding transfers.
This research utilises smart card and AVL data to study the impact of the new line on travel patterns (passenger flows), travel times and reliability from a passenger perspective by considering journeys including transfers. The metrics are calculated at a stop-cluster level, enabling also a distributional analysis of the impacts. Such a post-op analysis of any policy intervention or network change could be used to refine the demand predictive ex-ante tools.
Check the Transit Data workshop contributions of Malvika Dixit: Presentation and Extended abstract
Comments are closed.